Hart Metro Rapid Tampa Bay

May 2013

- http://viewer.zmags.com/publication/a97891bd?page=90#/a97891bd/90

City of Brampton Brampton, ON

May 2012

- The City of Brampton partnered with Enseicom to create and execute their newest bike shelters which will be installed near their Bus Rapid Transit stop stations. As an exclusive turnkey solution, Enseicom will design, develop, manufacture and install the bike shelters. The mandate also includes the creation of a branding logo to identify the new services. Implementation is scheduled for the summer of 2012.

City of winnipeg Winnipeg, MA

April 2012

- Enseicom attended the opening ceremony of Winnipeg’s new Southwest Rapid Transit Corridor. We provided design services, manufactured and installed heated shelters, canopies, signage and bicycle racks for the rapid transit stations at Harkness, Osborne, and in the Fort Rouge terminals.

APTA 2011 New Orleans, LA

October 2011

- Enseicom exhibited at the American Public Transportation Association Expo (Expo 2011) which is the largest public transportation expo in the world. This event is held every three years and features the latest in public transit trends and technologies. Expo 2011 welcomed over 17,000 transit professionals and more than 750 public transportation-related companies across 280,000 sq.ft of exhibit space.

Pattison outdoor Vancouver

May 2011

- Pattison Outdoor chose Enseicom to design and fabricate transit shelters for the District of West Vancouver. These units are located on Marine Drive and features low energy lighting and recycled plastic bench slats. The project was completed in September 2011.

Brampton Transit ZUM

April 2010

- Enseicom was chosen by the City of Brampton to detail the design, fabricate and install all the transit shelters for their new Bus Rapid Transit services - Züm. The first line, which runs from downtown Brampton to the transit hub at York University, was launched in September 2010. The following year, Züm expanded to include a new line on Main Street. This year, Phase III will include Züm Steeles avenue. All station stops were supplied by Enseicom and are equipped with ad boxes, digital displays posting next bus information in real time, heated waiting areas, lighting and security cameras, litter and recycling bins, detailed maps, customer service information and route schedules.

April 2010

- Enseicom was chosen by the City of Brampton to detail the design, fabricate and install all the transit shelters for their new Bus Rapid Transit services - Züm. The first line, which runs from downtown Brampton to the transit hub at York University, was launched in September 2010. The following year, Züm expanded to include a new line on Main Street. This year, Phase III will include Züm Steeles avenue. All station stops were supplied by Enseicom and are equipped with ad boxes, digital displays posting next bus information in real time, heated waiting areas, lighting and security cameras, litter and recycling bins, detailed maps, customer service information and route schedules.